For this job E1Muk was hired to undertake a road repair on a busy residential street.

Fast and reliable road repair service

This job was undertaken on the agreement that we would have the road closed for no more than 14 days as its a cut through. The road had been repaired badly many times and was given to another contractor that could not promise to get the work done on the time scale.

Because we have all our own plant and equipment it makes running these jobs so much easier. We can arrange the dig out and muckaway with ease as well as all the materials back in.

reliable road repair

Experienced team and professional equipment

This job was undertaken on the agreement that we would have the road closed for no more than 14 days as its a cut through.

The road had been repaired badly many times and was given to another contractor that could not promise to get the work done on the time scale.
Because we have all our own plant and equipment it makes running these jobs so much easier. We can arrange the dig out and muck away with ease as well as all the materials back in. 

E1Muk road repair

Respect for neighbours

The road has tenants on both sides that require access at all times. This has to be respected at all times as the road belongs to Network Rail and their tenants although wanting the work done also have businesses to run. The road closer did not include the pavements so we had to be extra mindful that the road is a route to two schools.

E1Muk Herts

Grab lorry site clearance

We arranged to take all our own materials using our Roll on Roll off lorry E11 MUK. 

A compound was made for us to work within to be able to help protect the general public. Having taken up all the old existing block paving, our flagship grab lorry E1 MUK came to site to remove all of the old material, bringing more materials needed.

 

reliable road repair

On time and on budget

the paving went down very quickly, having our own equipment really helped. After clearing all the equipment, again using E11 MUK to collect all the equipment the end product looked great.

All the tenants and Network Rail were happy with the block Paving that we had completed, the road was re-opened with in 10 days of the original day of closure.